Friday, September 3, 2010

AA1 Toad

I have been building this over a period of 3 or 4 nights so far - the chassis was pretty easy as was the superstructure of the body. The detail has been fiddly but worth it. The lamp irons (you can see the side one in this picture - it has a matched one on the other side and there are ones on each end) are spares from my J70 kit. The end ones have been twisted to look more like GWR ones than GER ones. Hand brake spare brake wheel from something or other.

Sill have to sort out the hand rails on the sides and the chimney. Then paint (GWR Grey) and transfer and await the arrival of the Materson 3 links I have ordered and connect it up to the P19 rake it will back stop.

No comments:

Post a Comment